For Engineering Consultancy
Hire As CTO
INTRODUCTION/OVERVIEW
We will give our own time for 12 to 24 months, where we work with you to produce ROI driven outputs.
Build the engineering process you always wanted.
- So, you have been running your Medium Scale company for a while now.
- The product/ service is proven & you are facing the actual problem
Of SETTING UP A FACTORY. You ARE one of the best in the market, and you know
it. - Now you want a sustainable flow of your production, a process to follow,
and an automated engineering system to bring you more sustainable
growth that will turn into profits.
Who should you hire?
ENGINEERING CONSULTANT VS FULL-TIME CTO
The good news: no need to hire a hefty salaried CTO per month. Let’s work together and we will prove the power of outbound engineering.
THE VALUE PROPOSITIONS : 3D 1M MODULE
3D 1M
Module
DESIGN . DEVELOP . DELIVER . MAINTAIN

DESIGN
We work jointly with you to identify the processes that are vital for the increase in production.
- We design the process flow and system to implement it
- We evaluate factory setup and design the plant layout
- We design your production schedules
- We design your machinery (Existing as well as new)
PERIOD : 3 Months
3D 1M
Module
DESIGN . DEVELOP . DELIVER . MAINTAIN

DEVELOP
Shop floor planning and manpower productivity can be optimized by leaps and bounds with Factory Design and Simulation. The solution is capable of optimizing resource plans by considering factors such as ergonomics, logistics, time-study, and bottleneck identification, along with scope for future expansion as well. Leveraging advanced technologies like 3D, it is POSSIBLE of DEVELOPING the best performance of your PRODUCTION lines.
PERIOD : 3 Months
3D 1M
Module
DESIGN . DEVELOP . DELIVER . MAINTAIN

DELIVER
Evaluate the production line performance of every setup you have with OEE (Overall Equipment Effectiveness) to make your productions truely effective. This effective manufacturing intelligence solution can empower your operations with overall shop floor effectiveness. It not only decreases downtime and improves yield but also enables you to measure the effective utilization of production lines and correlated factors affecting production quality & utilization. As a result, OEE reduces downtime while increasing the yield.
PERIOD : 3 Months
3D 1M
Module
DESIGN . DEVELOP . DELIVER . MAINTAIN

MAINTAIN
Manufacturing organizations will succeed to the
level to which they have become THIRFTY: Transparent, Higher, Interconnected, Remote, Flexible, Top notch, Yielding.
WE ENSURE THAT YOU MAINTAIN YOUR PACE.
PERIOD : 3 Months
What Makes Us Different
OUR AMAZING SOLUTIONS BASED ON
- Global resource
- Versatile engagement models
- Different industrial experience with extensive domain specialization
- Start-to-end solutions for optimization
- Proactive modus operandi to sustainable growth
TIMELINE (In Months)
